PNBE JANSHTABDI 15125 train passes through 11 major stations in 1 day to reach from Banaras to Patna Junction . It takes total of 4:50 hours journey to reach Patna Junction .

Maximum halt time of 15125 PNBE JANSHTABDI train is 10 minutes at Pt DD Upadhyaya Jn(DDU)

Four-point contact ball bearings are single row angular contact ball bearings featuring raceways designed to accommodate thrust loads acting in both directions. At the same time, radial loads can be partly supported up to a proportional value of the axial load. This kind of bearing requires less space in axial direction than double row bearings do. Normally, single row four-point contact ball bearings supporting thrust loads in both directions are mounted together with another pure radial bearing. In this case the four-point contact ball bearings are mounted with radial clearance in the housing and they act as pure thrust bearings.

Image

Train starts from Varanasi (BSBS) , Varanasi to Manamadurai Junction (MNM) , Manamadurai. Total duration is 10 Hours and 15 Minutes.

Image

Train starts from Bikaner (BSBS) , Bikaner to Kolkata Howrah Junction (HWH) , Kolkata. Total duration is 34 Hours and 20 Minutes.

In 15125 train route maximum halt time for this train is 10 minutes at Pt DD Upadhyaya Jn(DDU). Train 15125 arrives at Pt DD Upadhyaya Jn at 07:30 and departs at 07:40. So if you want to get down from the train and buy anything from the station or for little fresh air. It's safe to get down at this station. Other stations which have more than 5 minutes halt time are

Train starts from Varanasi (BSBS) , Varanasi to Gwalior Junction (GWL) , Gwalior. Total duration is 16 Hours and 10 Minutes.

Image

Train 15125 PNBE JANSHTABDI runs from Banaras(BSBS) to Patna Junction(PNBE) on Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, Sunday. Train departs from Banaras(BSBS) at 06:20 and reaches Patna Junction(PNBE) at 11:10. It takes 1 day to reach train 15125 from Banaras(BSBS) to Patna Junction(PNBE) .