Mityvac MV7400 Fluid Hand Pump - mv7400
You have no items in your wish list. Newsletter. Sign Up for ...
If the manufacturing processes are given in order, then first the parts necessary are taken out of the warehouse based on the requests from the plant side. The parts are carried from the building next to the plant via a conveyor and a vertical conveying equipment and then they are delivered to the plant on the first floor (servo motor production line) or second floor (servo amplifier production line).
For example, in the unit assembly process on the second floor, failure prediction is conducted for the robot reduction gears. Failure can occur on these reduction gears due to wear, but Yaskawa collects the robot utilization data with YASKAWA Cockpit and analyses that data with AI to generate a failure prediction model. This model is executed in the YASKAWA Cockpit to predict the trends in the wear on each individual reduction gear. It is possible to check the number of days remaining before the date of failure on the screen, so maintenance is implemented in a planned way before the failure to prevent any sudden production line stops.
The key part to the implementation of the concept is the digital data solutions, which are initiatives to embody the “intelligence” in the i3-Mechatronics concept. The YASKAWA Cockpit software tool, which plays the core role in i3-Mechatronics, was applied for this. This makes it possible to perform the steps from the data collection to the analysis all together. There are large volumes of data collected from the devices in the manufacturing site such as the servos, inverters and robots. AI analysis and big data analysis are performed on this data for use in failure prediction and preventive maintenance for facilities.
The following describes the “automatic switchover in setup” as an example of the initiatives to achieve multiproduct variable quantity production. In the main body assembly process in the servo motor production line, the automatic switchover of the setup for using different jigs is conducted automatically by the robot in accordance with the type of product arriving in the product flow. This makes it possible to conduct production efficiently even if the number of units produced is small.
It is possible to say that these advances were only achieved because of the automation techniques developed by the company over more than half a century and because the i3-Mechatronics (i cube mechatronics) solution concept Yaskawa put forward in 2017 was put into practice. The following describes each initiative at the Solution Factory that has embodied this concept.
Industriebedarf Grafe Hauptstr. 69 09212 Limbach-Oberfrohna, OT Kändler Telefon (+49) 03722/40 18 50 Telefax (+49) 03722/40 18 60 E-Mail info@industriebedarf-grafe.de
The following explains the next key points, which are “visualization” and data utilization. The other pillar supporting the realization of thorough automation is the connection of the production control data from the order receipt, through the manufacturing and up to the shipment. The manufacturing site is connected with data and there is constant monitoring of the situation of the equipment and the logistics. There is centralized monitoring of the operation situation in the plant from the integrated command center on the second floor of the plant. This monitoring makes it possible to respond quickly to the progress in the production plan and to any trouble that may arise.
Wheel bearings are small metal balls held within small rings that are designed to reduce rolling friction and allow the car's wheels to spin freely.
Mar 4, 2021 — The problem might be related to the speed sensor in the hub assembly. Additionally, the Stabilitrack service indicator activates intermittently.
The “Yaskawa Solution Factory” (hereinafter called the “Solution Factory”) that was prepared at the Iruma Plant (Iruma City, Saitama Prefecture) was completed in July 2018 and began full-fledged operations in December. The concept of the plant is “a next-generation production plant that will change manufacturing and business.” Dramatic productivity enhancement was achieved at the plant. For example, in the production of Σ-7 Series AC servo drives, the speed and efficiency are three times greater than that of conventional production and the lead time has been shortened to 1/6 the previous time.
201965 — Faulty wheel bearings can cause a vibration in your steering. It could also cause the vehicle to pull more toward one side. The steering ...
THE GOOD, THE BAD AND THE UGLY: WHAT TO LOOK FOR IN A QUALITY HUB ... Wheel hub bearings have an impact on several vehicle performance factors, such as tire wear, ...
Data communications is essential for the connection of each of the many components in a manufacturing site. In addition to the next-generation assembly stations, it is also necessary to have data connection between the equipment from multiple manufacturers that is used in the board mounting processes. Any break in this data will mean that automation is not achievable. This data communication became possible after continuing consultation with each manufacturer during the development of systems. In the production plan, in addition to the Manufacturing Execution System (MES), the production plan at the level above the MES is also executed on the system side to achieve high precision production planning.
First of all, the following is an explanation of the thorough implementation of automation. Yaskawa has long been offering the automation of each process with motion control techniques and robots as a particular field of expertise for the company. However, the key point for even further automation was to go beyond the automation of a single process to “connect” processes with other processes. In addition to connecting each process physically, it is also essential to connect them with data.
Brembo offers a wide range of high-performance discs and pads for your VOLVO XC90 I (275) 2.5 T AWD. Discover the catalogue!
by DP Fleming · 1991 · Cited by 13 — Bradfeld, C. D.; Roberts, J. B.; and Karunendiran, S.: A Programmable. Electromagnetic Bearing for Vibration Control of a Flexible Shaft. Rotating Machinery.
2018108 — How many hrs labor should I expect from a shop? I'm ... From past experience with my Envoy, I used Napa pro series for the bearings ...
Parker piston seals can cover working temperatures from -50°C to 230°C and working pressures up to 800 bar. Some seal profiles are insensitive to extreme ...
Servo motors with different capacities and shaft specifications are produced on the same line and at the minimum, it is even possible to support the production of just one unit.
Ever since the preparation and planning stage, the aim for the Solution Factory has been to produce a variety of different types in integrated production. The connection of each process without breaks realized the integrated production of both the servo motors and the servo amplifiers. Yaskawa considers this multiproduct variable quantity production to be the value most demanded in manufacturing sites.
The parts go onto an automatic guided vehicle (AGV) and are supplied to the production line automatically. Each assembly process has a standardized “next-generation assembly station” and the conveying equipment and robots operate cooperatively within those stations to perform the assembly automatically. The majority of the logistics within the plant is conducted using AGV and conveyors in a system where human labor is not necessary.
Whenever necessary, the demonstration results from the Solution Factory are provided as feedback to product development. This feedback raises the performance of the products and the advances in the products lead to improved equipment system performance. By applying that equipment to a plant, a “production improvement cycle” is created that improves productivity. The products from Yaskawa and the advances in the Solution Factory contribute to the construction by customers of high added value production lines.
20211213 — 5 Warning Signs of Faulty Wheel Bearings · 1. There's unusual tire wear. Abnormal tire wear may mean you have a problem with your wheel bearings.
The motion control products being produced at the Iruma Plant are incorporated into devices that are used in manufacturing sites both in Japan and overseas. To the manufacturing industry, these devices are capital investment, so it goes without saying that there are fluctuations in the demand for them. Since opening in 1964, the Iruma Plant has also seen repeated swings between slack periods and peak times. Furthermore, as the cycle speed for industrial products is becoming faster, there are increasing cases where products are required with short delivery times. When establishing the new plant, the company believed that to be resilient to fluctuations in demand and be compatible with small-quantity, large variety production would be precisely in line with the trends in manufacturing.
Many manufacturing sites are being forced to support multiproduct variable quantity production. The initiatives at the Solution Factory are not only for the company to sell products, but also to show the new Yaskawa solutions, which comprehensively solve the issues in manufacturing by utilizing digital data.